Crystal Hill Solar
DEPCOM Power provided full EPC services for the 65 MW Crystal Hill Solar project in Halifax County, Virginia—delivering utility-scale infrastructure to support grid reliability and long-term energy output.
DEPCOM Power provided full EPC services for the 65 MW Crystal Hill Solar project in Halifax County, Virginia—delivering utility-scale infrastructure to support grid reliability and long-term energy output.
Located in Virgina, Crystal Hill Solar is a 65 MW utility-scale solar facility engineered and constructed by DEPCOM Power. Built to meet growing energy demand in the region, the project was executed with a focus on safety, schedule discipline, and operational reliability.
DEPCOM delivered the full EPC scope, including site development, procurement, and integration of high-performance PV modules and tracking systems. Designed for long-term durability, the system supports efficient generation across seasonal and environmental conditions.
While the project’s primary function is energy generation, the site design also allows for adaptable land use, reflecting DEPCOM’s commitment to delivering infrastructure that meets both technical and strategic land management goals.
DEPCOM Power delivered EPC services for the Yuma Solar Energy Center—a 70 MW solar and 70 MW battery storage hybrid facility in Arizona, now in commercial operation.
A 200 MWdc solar EPC project in Northeast Kansas, Kansas Sky showcases DEPCOM’s ability to deliver high-value engineering solutions for utility partners.
DEPCOM Power is delivering a behind-the-meter solar and battery storage system for a steel manufacturing facility in Osceola, Arkansas—providing on-site power generation to support high-load industrial operations.
Leveraging our full range of capabilities, we deliver proven solutions across the sectors we know best: utility-scale solar, energy storage, behind-the-meter applications, and data centers. By focusing our expertise, we know the specific requirements of each market and tailor our approach accordingly, whether that means meeting aggressive timelines, integrating with existing infrastructure, or supporting long-term operational goals.